Stage 6

Commissioning of the air conditioner. Before putting the air conditioner into operation, a pressure test with nitrogen is conducted to ensure the tightness of the refrigerant lines. Air and moisture are removed from inside the refrigerant lines using a vacuum pump. Then, the valves of the outdoor unit are opened, and the refrigerant starts to flow into the pipes.
Submit your request for Air Flow installation, and we will get in touch with you within 5 minutes, from 9:30 AM to 8:30 PM, every day of the week.