Stage 6
Commissioning of the air conditioner. Before putting the air conditioner into operation, a pressure test with nitrogen is conducted to ensure the tightness of the refrigerant lines. Air and moisture are removed from inside the refrigerant lines using a vacuum pump. Then, the valves of the outdoor unit are opened, and the refrigerant starts to flow into the pipes.